TOWN OF GROTON

PUBLIC HEARING

   The Select Board has scheduled a public hearing for Monday, March 27th, 2023, at 7:30 p.m. in the Second Floor Meeting Room of the Groton Town Hall, 173 Main Street, Groton, to consider a request for the renewal of an Earth Removal Permit for Blood Farm on Parcel 15, Assessors’ Map 106.

   All interested parties are encouraged to attend.

SELECT BOARD:

John F. Reilly, Chair

Rebecca H. Pine, Vice Chair

Matthew F. Pisani, Clerk

Alison S. Manugian, Member

Peter S. Cunningham, Member

3/10/23 and 3/17/23 D

 

Notice of Public Hearing

   In accordance with Chapter 83 of the Massachusetts General Laws, the Town of Groton Sewer Regulations, and the Policy and Guidelines for a Submission to Extend Sewer District, the Groton Sewer Commission will hold a public hearing on Wednesday, March 29th, 2023 at 2:15 P.M. via Virtual Meeting using Zoom Pursuant to the Governor’s Executive Order to consider a proposed sewer extension to the property shown on Assessors’ Map 234, Lot 55-1. Please see Meeting posted at https://www.grotonma.gov/events/ for details regarding Zoom meeting information.

Groton Sewer Commission-

James L. Gmeiner

3/17 and 3/24/2023 B

Section 00 11 13

ADVERTISEMENT TO BID

MGL c.149 Over $150K

   The GROTON ELECTRIC LIGHT DEPARTMENT, the Awarding Authority, invites sealed bids from Contractors for the New Storage Facility in Groton, Massachusetts, in accordance with the documents prepared by HELENE·KARL ARCHITECTS, INC. 

   The Project consists of but not limited to: 

construction of a new 3200 SF pre-engineered building (cold storage) located at the substation. The scope includes limited site work, concrete foundations, a pre-engineered structure, insulated metal panels, overhead doors and lighting. 

   The construction will be administered using BidDocs’ construction software paid for by the Awarding Authority or Prime Designer. 

   The work is estimated to cost $600,000.00.

   All bidding Requests for Information (RFIs) shall be submitted online by and by 03/23/2023 at 5:00PM EDT for general bids. 

   Bids are subject to M.G.L. c.149 §44A-J & to minimum wage rates as required by M.G.L. c.149 §§26 to 27H inclusive. 

   THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL NOT BE ACCEPTED. Please review the instructions in the bid documents on how to register as an electronic bidder. All Bids shall be submitted online at www.biddocs.com and received no later than the date and time specified. 

   General bidders must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the following category of work, General Building Construction, and must submit a current DCAMM Certificate of Eligibility and signed DCAMM Prime/General Contractor Update Statement. 

   General Bids will be received until 30 March 2023 on 2:00PM EDT and publicly opened online, forthwith. 

Certificate of Eligibility and a signed DCAMM Sub-Bidder’s Update Statement. 

   TRADES – NONE 

   v1.0-20221001 MGL c.149 Over $150K 

   General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates), and made payable to the GROTON ELECTRIC LIGHT DEPARTMENT. Note: A bid deposit is not required for Projects advertised under $50,000. 

   Bid Forms and Contract Documents will be available for review at www.biddocs.com (may be viewed and downloaded electronically at no cost). 

   PRE-BID CONFERENCE / SITE VISIT: By Appointment Contact Name: Mr. Kevin Kelly
Contact Phone: 978-448-1150

   The hard copy Contract Documents may be seen at: 

Nashoba Blue Inc. 433 Main Street, Hudson, MA 01749, 978-568-1167 

Groton Electric Light Department, 23 Station Avenue, Groton, MA 01450

3/10 and 3/17/2023 C 

 

 

Invitation to Bid (ITB)

The Groton Electric Light Department invites sealed bids for:

Cab/Chassis-

TREE TRIMMING BUCKET TRUCK

   Bids must be received at GELD’s office by 1:00 pm, Thursday, April 6, 2023, at the GELD Operations Center, 23 Station Avenue, Groton, Massachusetts 01450.  Full specifications are included in the bid package which can be requested by emailing Tammi Lemire at tlemire@grotonelectric.org or calling 978-448-1150  .  Two (2) copies of the bids should be clearly marked Cab/Chassis-TREE TRIMMING BUCKET TRUCK.  Bids will be opened and read aloud at 1:00 pm, Thursday, April 6, 2023.

   GELD specifically reserves the right to reject any or all bids, waive any irregularities or informalities or to accept any bid which is deemed to be in the best interest of GELD.

3/10 and 3/17/2023 A

 

   The Zoning Board of Appeals will hold a public hearing on Wednesday, March 22, 2023 at 6:30 pm at the Groton Town Hall, second floor meeting room for the application of 500 MG LLC for a comprehensive permit to allow for the construction of 200 units of housing under Massachusetts General Law Ch. 40B and pursuant to Chapter 338 of the Town Code. The proposed project is on Assessor’s Parcel 216-94, 95, 96, 500 Main Street, Groton, MA, 01450. This development shall be known as The Groton Farms. This legal notice shall publish at www.masspublishers.org.

Bruce Easom, Chairman

3/3/23 and 3/10/2023 B

 

   The Select Board has scheduled a public hearing for Monday, March 27th, 2023, at 7:30 p.m. in the Second Floor Meeting Room of the Groton Town Hall, 173 Main Street, Groton, to consider a request for the renewal of an Earth Removal Permit for Blood Farm on Parcel 15, Assessors’ Map 106.

   All interested parties are encouraged to attend.

SELECT BOARD:

John F. Reilly, Chair

Rebecca H. Pine, Vice Chair

Matthew F. Pisani, Clerk

Alison S. Manugian, Member

Peter S. Cunningham, Member

3/10/23 and 3/17/23 D

 

   The GROTON ELECTRIC LIGHT DEPARTMENT, the Awarding Authority, invites sealed bids from Contractors for the New Storage Facility in Groton, Massachusetts, in accordance with the documents prepared by HELENE·KARL ARCHITECTS, INC. 

   The Project consists of but not limited to: 

construction of a new 3200 SF pre-engineered building (cold storage) located at the substation. The scope includes limited site work, concrete foundations, a pre-engineered structure, insulated metal panels, overhead doors and lighting. 

   The construction will be administered using BidDocs’ construction software paid for by the Awarding Authority or Prime Designer. 

   The work is estimated to cost $600,000.00.

   All bidding Requests for Information (RFIs) shall be submitted online by and by 03/23/2023 at 5:00PM EDT for general bids. 

   Bids are subject to M.G.L. c.149 §44A-J & to minimum wage rates as required by M.G.L. c.149 §§26 to 27H inclusive. 

   THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL NOT BE ACCEPTED. Please review the instructions in the bid documents on how to register as an electronic bidder. All Bids shall be submitted online at www.biddocs.com and received no later than the date and time specified. 

   General bidders must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the following category of work, General Building Construction, and must submit a current DCAMM Certificate of Eligibility and signed DCAMM Prime/General Contractor Update Statement. 

   General Bids will be received until 30 March 2023 on 2:00PM EDT and publicly opened online, forthwith. 

Certificate of Eligibility and a signed DCAMM Sub-Bidder’s Update Statement. 

   TRADES – NONE 

   v1.0-20221001 MGL c.149 Over $150K 

   General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates), and made payable to the GROTON ELECTRIC LIGHT DEPARTMENT. Note: A bid deposit is not required for Projects advertised under $50,000. 

   Bid Forms and Contract Documents will be available for review at www.biddocs.com (may be viewed and downloaded electronically at no cost). 

   PRE-BID CONFERENCE / SITE VISIT: By Appointment Contact Name: Mr. Kevin Kelly
Contact Phone: 978-448-1150

   The hard copy Contract Documents may be seen at: 

Nashoba Blue Inc. 433 Main Street, Hudson, MA 01749, 978-568-1167 

Groton Electric Light Department, 23 Station Avenue, Groton, MA 01450

3/10 and 3/17/2023 G 

 

 

   Bids must be received at GELD’s office by 1:00 pm, Thursday, April 6, 2023, at the GELD Operations Center, 23 Station Avenue, Groton, Massachusetts 01450.  Full specifications are included in the bid package which can be requested by emailing Tammi Lemire at tlemire@grotonelectric.org or calling 978-448-1150  .  Two (2) copies of the bids should be clearly marked Cab/Chassis-TREE TRIMMING BUCKET TRUCK.  Bids will be opened and read aloud at 1:00 pm, Thursday, April 6, 2023.

   GELD specifically reserves the right to reject any or all bids, waive any irregularities or informalities or to accept any bid which is deemed to be in the best interest of GELD.

3/10 and 3/17/2023 A

 

Town of Groton

Conservation Commission

   In accordance with the Massachusetts Wetlands Protection Act, M.G.L Ch. 131, Sec. 40 and the Groton Wetlands Protection Bylaw, the Groton Conservation Commission will hold a public meeting on Tuesday, March 14, 2023 at 6:30 p.m. to consider a Request of Determination of Applicability filed by Hannah Kowalski (Dandelion Energy) for the installation of a geothermal system at 100 Hollis Street (Groton Assessor’s Parcel 112-108.2). The meeting will be held in the second floor meeting room with the option to connect virtually via Zoom - please see https://www.grotonma.gov/events/ or call/email the office of the Conservation Commission at 978-448-1106 or conservation@grotonma.gov for details regarding this hearing. 

Respectfully submitted,

Eileen McHugh, Chair 

Groton Conservation Commission

3/3/2023 H

 

 

Town of Groton

Conservation Commission

   In accordance with the Massachusetts Wetlands Protection Act, M.G.L Ch. 131, Sec. 40 and the Groton Wetlands Protection Bylaw, the Groton Conservation Commission will hold a public meeting on Tuesday, March 14, 2023 at 6:40 p.m. to consider a Request of Determination of Applicability filed by the Invasive Species Committee for the treatment of invasive vegetation at the Groton Town Forest (Groton Assessor’s Parcels 210-4, 4.1, 5). The meeting will be held in the second floor meeting room with the option to connect virtually via Zoom - please see https://www.grotonma.gov/events/ or call/email the office of the Conservation Commission at 978-448-1106 or conservation@grotonma.gov for details regarding this hearing. 

Respectfully submitted,

Eileen McHugh, Chair

Groton Conservation Commission

3/3/2023 G

 

Pages

Groton Herald

Mailing Address
P.O. Box 610, Groton, Massachusetts 01450
 

Office
145 Main Street, Groton, Massachusetts 014510
[Prescott Community Center]
 

Telephone: 978-448-6061
 

Comment Here